ABOUT 310 of the 615 piles designed for the 2nd Niger Bridge have been sunk, while massive sand-filling of the approach road has been carried out to the height of five metres, Federal Controller of Works, Anambra State, Mr. Innocent Alumona, has said.

The post 2nd Niger Bridge: 310 out of 615 piles sunk—Works controller appeared first on Vanguard News.



source https://www.vanguardngr.com/2018/06/2nd-niger-bridge-310-615-piles-sunk-works-controller/
Share To:

Unknown

Post A Comment:

0 comments so far,add yours